26/02/2026
📢 Tatweer Misr – Marina Towers Broadcast Summary

🏔️ Tatweer Misr Highlights
• 20M meters of mountain excavation completed.
• 2,250 units delivered in Il Monte Galala.
• 4,000 units approaching delivery soon.
• Winner of Cityscape Dubai Global Award.
• First Crystal Lagoon on a mountain — 20,000 sqm (3 km beachfront).
• First Crystal Lagoon in Fouka – 100,000 sqm.
• One of the top global strategic partners of Crystal Lagoons Co.
• Fully integrated construction: Tatweer buys and controls all materials used.
• Curtain Hospitality to begin Fouka operations this year.
• D-Bay: 400 units delivering 2026; 1,000 units ongoing.
• Salt’s beach cliff leveled from 22m to 3m — a license held only by Tatweer Misr & Emaar.
• Most project units across destinations enjoy sea views.
• Nearly approved for the 2nd marina license in the North Coast.
• Masterplanning & architecture by Gianluca’s Studio – Italy.
• 2025 Deliveries: 1,153 units, reaching 2,000 units in Bloomfields.
• First Cairo project with rooftop facilities.
• Sales Achievements:
• 4B EGP in “Clusters”
• 7B EGP in “Scenes” (delivery within 2 years)
• Rivers project will deliver one year early.
• ~1,800 units delivered in 2025 across all projects.
⸻
🌊 Marina Towers – Key Highlights
⚓ The Marina
• First-ever license to build a marina with towers inside it.
• 800m-long marina housing:
• F&B
• Retail
• Commercial spaces
• Year-round conference center
• Capacity for 150 yachts.
• Inspired by Zaitouna Bay – Lebanon.
• 23,000 sqm commercial + conference facilities inside the marina.
• Three bridges connecting all marina components.
• Additional commercial strip 30m above sea level.
• Total retail built-up area: 50,000 sqm.
• International Operators:
• IGY Marinas (USA) – operates marinas in Cannes & NEOM.
• BCI – manages conference centers similar to Cannes.
• Marriott operating 500 hotel rooms & serviced apartments.
• Upper and lower marinas connected via bridges.
• Possibility of relocating the project road to the rear for expanded access.
⸻
🏙️ The Towers
• 9 towers located on the marina + 1 tower (Maesta) at the highest project point.
• Maesta Tower:
• Built at 210m above sea level
• Reaching 270m elevation
• All licenses approved by Hay2a Handaseya & Presidency of Egypt.
• 1,200 parking spaces + podium parking similar to Dubai.
• 300,000 sqm built-up area; 2,800 units in total.
• All units enjoy full sea views.
• Fully finished units with smart systems (Schneider partner).
• Ceiling height: 3.5 meters.
• Tower 5 & 6 launching first.
⸻
🏨 Hospitality & Branded Living
• Marriott-branded apartments.
• Towers 1 & 2 designated as Marriott Hotel.
⸻
🏠 Unit Types
• Studios
• 1-bedroom apartments
• 2-bedroom apartments
• 3-bedroom apartments
• Lofts (located near tower link)
• Penthouses (4 per upper floors; can be combined into 2 on request)
• Marina Residence buildings = similar to Phia units, with private jacuzzis.
• Towers: G+20, with ground & 6th floor dedicated to services.
⸻
🏢 Tower Services & Amenities
• Living / lounge rooms
• Workspaces
• Kids’ areas
• Concierge
• Saunas
• Fitness hub & gyms
• Executive floor
• Viewpoint decks
• Swimming pool
• Cinema rooms
• Executive lounges (restricted access)
⸻
🌍 Strategic Location
• The first stop after crossing the Suez Canal.
• IGY’s network includes:
• 20,000 clients
• 10,000 superyachts
⸻
📌 Payment & Delivery
• Delivery: 4.5 years
• Payment Plans:
• 5% – 10 years
• 10% before delivery
• 7-year backloaded
• Discounted 5-year plan
• 10% maintenance fee.