05/15/2025
Filed an appeal in the Fourth Circuit this week. The project damaged my land. The permits were ghost-signed. The judge dismissed under six doctrines—just to be safe. Also, the engineer was gagged. Not even the funny kind.
Brief’s here.:
https://1drv.ms/b/c/a1154668afe89f29/ETrufoWRFMxEp3BbU-Y76usBsYct92AR9wAMHzUVBcU2Ug?e=gU30uK
Gag Clause here:
https://1drv.ms/i/c/a1154668afe89f29/EfYBkn9QDrdJmcw1D865lrsBrmkoAPRemNZwVFIa_K0AHA?e=2TiDMa
I’ll be over here posting otters.