18/10/2021
Justice for the residents of Biscoe, Arkansas was a long time coming. In September of 2017, contractors building new bridges over the white river, near Biscoe, cross connected the water and sewer lines, pumping raw sewage into the entire Biscoe water system and the homes connected to it. The case settled after 4 days of trial which will result in a new water system for the city and new plumbing for the impacted homes.