We are back in Over Hulton for an update on 1 of 2 Dormer loft conversion that we are carrying out on the same street! π
We have now completed the installation of the flooring structure that was seen in a previous video, installed the new ridge beam, relocated the rear purlins, constructed the dormers, installed the new roof to the dormers, carried out some first fix electrics and plumbing where required under the floor, installed the 22mm chipboard flooring, installed the new windows to the 1st floor of the property and almost finished the construction of the internal stud walls. π¨
Once we have competed the construction of the stud walls, we can then move on to the insulation, complete the 1st fix plumbing, electrics and air conditioning and then move on to plaster boarding..
If you are thinking about carrying out a similar project and require help from the very start, we can assist with the initial architectural drawings, planning permission and building regulations. As well as completing the entire project from start to finish. βοΈ
-
-
-
-
-